top of page

Equipment Designs

During my internship at Redwood Materials, I designed and validated multiple assemblies and subsystems to support maintenance and operations in a high-volume battery manufacturing plant.

​​

  • Sealed E-Magnet Enclosure

    • Designed a fully sealed mechanical enclosure for metallic powder reject collection, built from scratch to manufacturing-level tolerances.

    • Integrated a continuous liner concept for safe material handling procedures

    • Incorporated strict design criteria: no metal-to-metal contact, earthquake-resistant anchoring, stable frame geometry, and safe operator access.

    • Integrated hinged access panels, elastomeric gaskets, and modular mounting features for maintenance and operability.

    • Performed static structural FEA to evaluate stresses, deflections, and safety factors; validated structural performance before release.

​

​

​

  • Heavy-Duty Spool Rack

    • Developed a mobile storage/handling rack rated for 600+ lb static and dynamic load cases.

    • Integrated lifting points, low-RPM rotational bearings, and locking casters to ensure mobility and stability during operation.

    • Designed under dimensional constraints of the filter press platform, accounting for clearance and ergonomic handling.

    • Conducted FEA on primary load-bearing members to validate stress distribution, buckling resistance, and deflection limits.

    • Released final design to manufacturing with detailed engineering fabrication drawings, weld symbols, and tolerance callouts.

​​

​

​

​

  • Additional Projects

    • Supported development of powder handling safety procedures (bag-in/bag-out methods).

    • Designed mounting brackets and feeder components for circle feeders and pneumatic samplers.

    • Performed piping layout verification using P&IDs and process workflows to ensure clearances and maintenance access.

    • Created part and assembly drawings with revision control in PDM, ensuring traceability from concept to build.

E-Magnet Dust Collection Enclosure

Screenshot 2025-08-21 at 13.51.54.png

Heavy Duty Spool Rack

Screenshot 2025-08-21 at 14.08.24.png
Screenshot 2025-08-21 at 14.06.24.png

Additional parts and FEAs

Screenshot 2025-08-21 at 15.09.02.png
Screenshot 2025-08-07 141753.png
bottom of page